14-7-1: CERTIFICATION:
If the following floodproofing requirements are to be utilized for a particular structure in accordance with these regulations, the methods used must be certified as adequate by a registered professional engineer, architect, or other qualified person. (Ord. 15-16, 10-5-2015)