901.09 CHANGES REQUIRED; COST.
   A permittee may be required at any time by the Director of Public Works to make any necessary change in the construction or location of a permitted use required in connection with any change of street by the City, or in connection with the authorized location or change of location of public utility service lines, pipes, poles or other equipment. Any change in construction or location required by the City shall be paid for by the City, and any change in construction or location required by a public utility shall be paid for by the public utility for whose benefit such change is required.
(Ord. 1664. Passed 1-3-50.)