Upon completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor and verified by the community building inspector in all flood zones established by this chapter and any special requirements applicable to AO zones. The certification shall be provided to the floodplain administrator using the current FEMA elevation certificate. (The state recommends the certification of the lowest floor including basement be performed after the slab has been poured for slab on grade or when the lowest floor is complete and prior to the start of framing.) (Ord. 2007-04, 12-4-2007)
Next Doc