131.07(A) Prior to commencing the
of
in the
, a permittee shall conduct whatever subsurface engineering research is reasonable and necessary to determine the location of existing underground
so as to prevent the same from being disturbed by the permittee’s
. At a minimum the permittee shall comply with the procedures set forth in F.S. § 556.105.
131.07(B) The permittee shall bear the cost of compliance with this Section.
(Ord. 2010-23, passed 10-4-2010)