§ 127.30 EARTHWORK AND COMPACTION.
   127.30(A)   All organic and other unsuitable material shall be removed under those areas to be paved and for the full width of the .
   127.30(B)   Suitable backfill shall be used and compacted as directed by the . This backfill can be subjected to standard testing if required by the .
   127.30(C)   No blasting will be permitted.
(Ord. 2010-20, passed 10-4-2010)