§ 127.11 PRECONSTRUCTION RESPONSIBILITIES.
   127.11(A)   The contractor shall obtain a “SUNSHINE 811” Certification number and notify   at least 48 hours prior to beginning any excavation.
   127.11(B)   Prior to beginning , the contractor shall verify the size, location, elevation, and material of all existing utilities within the area of .
   127.11(C)   The contractor shall be responsible for damage to any existing utilities.
   127.11(D)   If upon excavation, an existing utility is found to be in conflict with the proposed or to be of a size or material different from that shown on the plans, the contractor shall immediately notify the , who will in turn notify the .
   127.11(E)   All permit requirements shall be installed prior to beginning of and maintained throughout the .
(Ord. 2010-20, passed 10-4-2010; Am. Ord. 2019-12, passed 9-23-2019)