111.03(A)
and
. For extensions of the
system in the :
111.03(A)(1) If a main already exists in a
abutting a property line, but there is no
, or a replacement lateral is necessary, then the
/developer shall construct the
and
, or at the
/developer’s expense the
shall construct the
and
.
111.03(A)(2) If a new main is required, then both the main and the
may be constructed at the same time as the new main. A water
may, at the sole discretion of the
, be constructed either at the same time as the lateral or subsequently. If either one is constructed by the developer, title to the completed product shall be transferred to the
.
111.03(B)
and
. Extensions of the Sunrise
system in the
shall comply with City of Sunrise Code of Ordinances regarding water and
.
111.03(C) New mains not in master plan. Any new facilities between those depicted in a master plan and the for a shall be constructed by the
/developer, at his or her own expense. Drawings and specifications shall be submitted to the applicable
for review. The applicable
shall either approve them or return them for revision and resubmittal. If the applicable
determines that any portion of the work must be an
, then the
/developer shall be required to design and construct the
at
/developer’s cost and shall be required to dedicate said facilities to the .