(a) All new buildings or structures or additions in residential one, two and three family dwellings:
(1) One-family dwellings base fee | $200.00 |
(2) Two and three-family dwellings, per dwelling unit base fee | $100.00 |
(3) Also, all new construction in residential one, two and three family dwellings to pay a usable floor area fee, per square foot in all stories including basement and garage areas | $.10 |
(b) Residential buildings, one, two and three family dwellings, alterations and/or repairs:
(1) Initial fee | 200.00 |
(2) Also, all affected usable floor area fee, per square foot in all stories | .10 |
(c) Residential buildings, accessory detached:
(1) Garages, gazebos, pergolas, arbors, trellises and outdoor kitchens: | |
A. Initial fee | 50.00 |
B. Also, per square foot of floor area | .05 |
(2) Utility building, exclusive of any utilities - initial fee | 25.00 |
(3) Fence | 25.00 |
(d) Buildings, structures, and additions as regulated by OBC:
(1) Base fee per permit | 200.00 |
(2) Also, per square foot of floor area (single tenant) | .075 |
(3) Shell construction only per sq. ft. (multiple tenant) | .0375 |
(4) Tenant buildout in new construction per sq. ft. | .0375 |
(e) Business or industrial building, alterations, repairs,
or tenant change as regulated by OBC:
(1) Initial fee | 200.00 |
(2) Also, per square foot of floor area affected | .0375 |
(f) Greenhouse in excess of 260 square feet: | |
(1) Initial fee | 50.00 |
(2) Also, for each square foot of floor surface or fraction thereof | .025 |
(3) Quonset hut-type structure with utilities - initial fee | 50.00 |
Also, for each square foot of floor surface | .025 |
(g) Storage tanks, not including septic tanks:
Gallon Capacity
(1) 2,000 or less | $15.00 |
(2) 2,001 through 12,000 | 25.00 |
(3) 12,001 through 20,000 | 35.00 |
(4) 20,001 through 50,000 | 50.00 |
(5) 50,001 through 100,000 | 75.00 |
(6) Over 100,000 | 100.00 |
(h) Swimming pool fees:
(1) Above-ground pools 48" deep and over and spas | 50.00 |
(2) Inground swimming pool or any other artificially created body of water | 100.00 |
(i) Temporary structures
(1) Initial fee | 25.00 |
(2) Each additional structure | 10.00 |
(j) Examination of plans by Board of Building and Zoning Appeals:
Except for appeals under Chapter 1317, the following fees shall be charged when it is necessary for the Board of Building and Zoning Appeals to review plans, types of material or construction or other areas within their jurisdiction and are in addition to any other permit fee set forth in this chapter:
(1) For one-family, two or three-family dwellings | 100.00 |
(2) For other buildings | 100.00 |
(3) Mailing fee/letters and public notices | 50.00 |
(4) Property maintenance appeal | 50.00 |
(5) For additions to any buildings: | |
A. Minimum fee | 50.00 |
B. For each square foot of usable floor area, calculated from outside measurements | .05 |
(k) Fees for examination of plans and specifications by Building Department and/or City Architect: The following fees shall be charged in addition to any other fees set forth in this chapter:
(1) New construction including additions:
A. 1. One, two and three-family dwellings | 100.00 |
2. Also, all new construction in residential one, two and three family dwellings to pay a usable floor area fee, per square foot in all stories including basement and garage areas | .05 |
3. Accessory structures or appurtenances thereto (sheds, decks, patios, etc.) | 25.00 |
B. 1. Four units or more, multiple-family, office, commercial, industrial and/or all construction governed by the OBC | 200.00 |
2. Also, per sq. ft. of floor area (single tenant) | .10 |
3. Shell construction only per sq. ft. (multiple tenant) | .05 |
4. Tenant buildout in new construction Per sq. ft. | .05 |
(2) Alterations, repairs or change of use. | |
A. 1. One, two and three-family dwellings | 25.00 |
2. Also, all affected usable floor area fee, per sq. ft. in all stories | .05 |
3. Accessory structures or appurtenances thereto | 5.00 |
B. 1. Four units or more, multiple-family, office, commercial, industrial and/or all construction governed by the OBC | 200.00 |
2. For each sq. ft.of the actual area affected by the alteration or change of occupancy which may extend beyond the limits of construction | .075 |
(3) Automatic Fire Suppression Systems | |
A. Four units or more, multiple-family, office, commercial, industrial and/or all construction governed by the OBC | 200.00 |
B. For each square foot of the actual area affected by the construction, alteration, or change of occupancy which may extend beyond the limits of construction | .05 |
(4) Fire Alarm Systems. | |
A. Four units or more, multiple-family, office, commercial, industrial and/or all construction governed by the OBC | 200.00 |
B. Also, per device | 5.00 |
(5) Kitchen Exhaust Hoods and Related Fire Suppression Systems as governed by the OBC, per hour | 110.00 |
(6) Fees in subsections (l)(1) and (2) hereof are for the first examination of plans including addendums to the approval or the correction letter. Should a resubmission of plans be required, the fee for re-examination shall be based on an hourly rate or portion thereof | 110.00 |
(7) The fee for preliminary plan examination, if requested in writing by the applicant, shall be based on an hourly rate or portion thereof | 110.00 |
(8) Landscaping fees: Addition to or replacement of existing landscaping: | |
Residential (per lot) | 5.00 |
Commercial, industrial per lot or occupant | 25.00 |
(9) Additional penalty fees: | |
A. Where work is begun without first obtaining a permit and paying the fee as indicated above, the applicant for a permit shall be charged a fee of triple the amount of the fee indicated in this section | |
B. Reinspection of same item | 100.00 |
C. Inspection call and appearance of inspector on property and work not ready | 100.00 |
D. Work covered without inspection | 100.00 |
(Ord. 2021-118. Passed 12-2-21.)