1231.04 BUILDING PERMIT APPLICATION AND CERTIFICATION.
   All applications for building permits shall be made in triplicate on forms furnished by the Director of Inspections and shall be accompanied by a plat in triplicate, drawn to scale and showing the actual dimensions of each lot upon which the building of a structure is proposed to be done, the size and location of each such structure upon each such lot and such plans drawn to scale, specifications and other information as may be necessary to enable the Director to determine that the proposed structure and use of land will conform to the provisions of this Zoning Code or as approved and modified by Council. No building permit shall be issued without certification thereon by the Director that the building proposed to be done thereunder will conform to the provisions of this Zoning Code. Such certification shall be made or refused within fifteen days after receipt by the Director of a copy of such application and plat.
(Ord. 1988-76. Passed 6-16-88.)