1129.13 DESIGN STANDARDS.
   The design of the water system, storm and sanitary sewerage systems and roadways shall be in accordance with the various aforesaid standards and requirements, including all backfill materials as directed by the Director of Engineering. Drawings and specifications for the improvements shall be reviewed and approved by the Director and the installation shall be subject to his continual inspection.
   At the completion of the construction, and before acceptance by the Director, the developer shall furnish the City a set of record tracings showing the locations, sizes and elevations of all underground utilities.
(Ord. 1964-62. Passed 7-16-64.)