(A) Existing fees.
Number of Lots | Preliminary | Final | Public Works Inspection | Total |
0-5 | $115 | $40 | $125 | $280 |
6-15 | $110 | $35 | $125 | $270 |
16-29 | $105 | $30 | $125 | $260 |
30-40 | $100 | $25 | $125 | $250 |
41 and above | $95 | $20 | $125 | $240 |
(B) Proposed fees; single-family subdivision.
Number of Lots | Preliminary | Final | Public Works Inspection (per lot) | SWPPP Permit Fee |
1-5 | $200, plus $125 per plot | $75 per lot | $150 | $400 |
6 and above | $450, plus $75 per lot | $50 per lot | $150 | $400 |
(C) Proposed fees; multi-family/townhomes/apartments.
Number of Buildings | Preliminary | Final | Public Works Inspection (per 100 feet of road) | SWPPP Permit Fee |
Cost per building | $50, plus $175 per building | $100 per building | $150 | $400 |
(D) SWPPP fees for building permits. The permit fee, when a SWPPP is required, shall be $400.
(E) Other regulations.
(1) These fees will include adding one FTE.
(2) All SWPPP fees cover the review fee and six months of inspections. A $50 per month fee will be added for extensions of the SWPPP.
(Prior Code, § 4.16.050) (Ord. 05-2019, passed 2-6-2019)