§ 33.001 PUBLIC WORKS AND CODE ENFORCEMENT FEE SCHEDULE.
Equipment Description
Comments
Hourly Rate
Equipment Description
Comments
Hourly Rate
Bobtail dump truck w/o operator
 
$60
Crane/bucket truck w/o operator
 
$70
Laborer
General labor, small equipment operator
$18
Loader/backhoe w/o operator
 
$75
Motor grader w/o operator
 
$80
Mower attachment
Used in addition to tractor
$35
One-ton dump truck w/o operator
 
$40
Pickup truck w/o operator
 
$20
Professional charges
Attorney, engineer, and the like
$125*
Skilled operator/driver
Equipment operator, truck driver
$25
Small hand tools
Weed eater, chainsaw, compactor, and the like
$10
Street sweeper w/o operator
 
$50
Supervisor
Director, Code Enforcement Official, department head
$35
Ten-wheel dump truck w/o operator
 
$80
Track hoe w/o operator
 
$80
Tractor w/o operator
 
$60
Water truck w/o operator
 
$60
Weed sprayer w/o operator
 
$40
Notes to Table:
*   Professional fees will be billed at a minimum of one hour (tax lean filing, miscellaneous engineering, and the like). Should legal, engineering, or other professional services be rendered to abate any situation, the actual bill received for those services, plus a 20% administrative fee, will be charged.
**   All equipment and labor will be billed at actual time at the job, including transport time to and from the site, rounded up to the nearest half hour, and at a minimum of one hour per piece of equipment or employee per lot or location.
***   All invoiced costs incurred by the city will be billed at actual cost, plus a 20% administrative fee.
 
(Prior Code, § 4.16.020) (Ord. 06-2011, passed 9-21-2011)