1202.03 COST OF INSTALLATION.
   The developer shall furnish and pay the entire cost and expense of installing the street lights including but not limited to, foundations, anchor bolts, standards, luminaires and lamps. The Electric Division shall determine the cost of trenching, underground cable and backfill for street lighting electrical distribution and the developer shall pay the cost to the Electric Division. The payment of this cost shall be a condition of final plat approval.
(Ord. 80-27. Passed 5-6-80; Ord. 06-14. Passed 5-16-06.)