§ 153.501 MONUMENTS.
   (A)   General requirements. All research, investigation, monumentation, measurement specifications, plats of survey, descriptions and subdivision plats shall conform to the minimum standards for boundary surveys in the state, O.A.C. 4733-37. These standards are intended as a minimum requirement, and where the surveying profession requires or recommends a higher level of standards, the higher or most restrictive of such standards shall apply.
   (B)   Location. Monuments shall be placed at all angle points on the outside boundary of the subdivision. Iron pins shall be placed at all corners of all lots, intersections of the centerlines of streets, and at the beginning and end points of each curved street section centerline. In those cases where sanitary sewer manholes prevent the setting of monuments, such monuments shall be offset five feet in each direction along the street centerline.
   (C)   When set. Monuments in the street centerlines shall be placed upon the completion of paving of the streets. All other monuments are to be set upon completion of the street, water, sanitary sewer improvements, and over lot grading and before acceptance of improvements by the city.
   (D)   Materials. Monuments shall be not less than 30 inches long consisting of a one-inch diameter iron pin. Iron pins shall be as per the standards cited in division (A) above.
(2003 Code, § 153.491) (Ord. 3459, § 37.13, passed 3-7-2002) Penalty, see § 153.999