A. Wastewater Systems:
1. All subdivisions relying on individual onsite wastewater treatment and disposal systems shall comply with all applicable rules and regulations of DuPage or Kane County and other governmental authorities.
2. In subdivisions not relying on septic systems, there shall be provided a complete wastewater collection system, including a service connection for each lot, and a sewage treatment plant, land application system or other such disposal facilities. All such sewerage systems shall be designed and constructed in accordance with applicable State, County and local plans, standards and regulations and in accordance with accepted modern sanitary engineering practices.
B. Water Supply And Distribution:
1. Individual water supplies (private wells) are permitted provided they meet all applicable State and Kane or DuPage County regulations.
2. All public or community water supply and distribution systems shall provide all appurtenances and stubs to each lot and shall be designed and constructed in accordance with applicable State, County and local plans, standards and regulations.
C. Stormwater Drainage And Management Facilities: Stormwater drainage and management facilities shall be required in accordance with the applicable regulations of DuPage County, as cited in section 11-7-2 of this chapter, and other governmental authorities, subject to final approval by the Corporate Authorities.
D. Oversizing Of Utilities: Where determined by overall utility planning, the Village Board may require certain utilities to be larger than necessary to serve the subdivision as delineated in the preliminary plan. In such case, an agreement may be made to repay the subdivider the construction cost resulting from the increased design. All engineering, insurance and inspection costs shall be paid by the subdivider. (Ord. 91-21, 8-6-1991)
E. Other Utility Services: All new and existing lines in proposed developments for telephone, electric, gas, cable television and other similar services shall be placed underground. Existing lines in rights-of-way or easements adjacent to any proposed development shall be placed underground. Conduits or cables shall be placed within easements or dedicated public rights-of-way in a manner which will not conflict with any other underground service. All transformer, cable and telephone boxes shall be located along rear lot lines or at such other locations as will not be unsightly or hazardous to the public. (Ord. 00-06, 2-15-2000)
F. JULIE: The owner or subdivider or any contractor or subcontractor of owner or subdivider shall contact JULIE prior to commencement of any excavation work. (Ord. 91-21, 8-6-1991)