1173.06 DEVELOPMENT PLAN REVIEW.
   (a)    Upon receipt of a preliminary plan the Director shall ensure that all information required in Section 1173.05 is documented. If any of the required information prescribed in Section 1173.05 is absent, or if components of the plat are found to be in conflict with the Comprehensive Development Plan, the Director shall issue a completed “Attachment B” to the Owner/Developer. Upon receipt of the returned plan and “Attachment B” the Owner/Developer or his agent shall cause to occur all necessary corrections outlined in the attachment and forward the revised plan to the Director. If the preliminary plan is determined by the Director to be in compliance with the standards of this ordinance and all additional components of the Comprehensive Development Plan, the review process may continue.
   (b)   Upon satisfactory completion of the provisions of item (a) above, the Director shall forward a copy of the preliminary plan to the Village Engineer. Upon receipt of the plan, the Village Engineer shall review the plan and within fourteen (14) days of receipt, return an “Attachment C” to the Director outlining all necessary studies, reports, plans, and specifications necessary for review in relation to the proposed subdivision’s planned public improvements. Upon receipt of the “Attachment C”, the Director shall forward it to the Owner/Developer or his agent who shall provide the Director with copies of all plans and specifications listed in the attachment for review by the Village Engineer. All plans and specifications involved with the public improvements of a proposed subdivision must be stamped with the official seal of a State of Ohio Registered Engineer.
   (c)   Within thirty (30) days of receipt of all plans and specifications listed in the applicable “Attachment C”, having been forward the documents by the Director, the Village Engineer shall review the plans against this ordinance, any other Village ordinances, Subdivision Design Standards, and other regulations that are relevant to the construction of public improvements within the corporation limits of the village. If in the professional opinion of the Village Engineer the plans are determined to be incomplete or contain construction details not compatible with the provisions of this ordinance, the Village Engineer shall provide written comments to the Director who shall contact the Owner/Developer’s consulting engineer and identify the violations. Upon identification of these items, the consulting engineer shall forward copies of the revised plans, drawings and specifications to the Director for review by the Village Engineer. Within fifteen (15) days of receipt of all revised plans and specifications, the Village Engineer shall either recommend approval the plans and proceed to Section 1173.07, or issue an additional “Attachment C”.
(Ord. 65-2015. Passed 11-2-15.)