§ 52.020 PRE-WIRING FOR REMOTE WATER READING UNITS.
   (A)   All new dwelling units constructed within the service areas of the utility shall be pre-wired by the builder with suitable transmission wire as a part of the construction costs to the unit.
   (B)   When the water service is ordered for the unit, a reasonable fee will be charged by the Building Commissioner, in addition to the costs of the water service connection, to compensate for materials, labor and/or equipment to install a water meter remote read unit at the location in the new dwelling unit.
(Ord. 19-01, passed 4-9-19)