(A) All new dwelling units constructed within the service areas of the utility shall be pre-wired by the builder with suitable transmission wire as a part of the construction costs to the unit.
(B) When the water service is ordered for the unit, a reasonable fee will be charged by the Building Commissioner, in addition to the costs of the water service connection, to compensate for materials, labor and/or equipment to install a water meter remote read unit at the location in the new dwelling unit.
(Ord. 19-01, passed 4-9-19)