7-5-5-2: INDIVIDUAL WASTEWATER DISCHARGE PERMIT CONTENTS:
An individual wastewater discharge permit shall include conditions deemed reasonably necessary by the Manager to prevent Pass Through or Interference, protect the quality of the water body receiving the treatment plant’s effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW.
   A.   Individual wastewater discharge permits must contain:
      1.   A statement that indicates the wastewater discharge permit issuance date, effective date, and expiration date;
      2.   A statement that the wastewater discharge permit is non transferable without prior notification to, and approval from, the SGRWRF, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit;
      3.   Effluent limits, including Best Management Practices, based on applicable Pretreatment Standards in part 403 of the Code of Federal Regulations, categorical Pretreatment Standards, local limits, State and local law.
      4.   Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, and sample type, based on Federal, State, and local law.
      5.   A statement of applicable civil and criminal penalties for violation of Pretreatment Standards and Requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable Federal, State, and local law.
      6.   Requirements to control Slug Discharge, if determined by the Manager to be necessary.
      7.   Requirements to report to the Manager any slug discharge.
      8.   Requirements to notify the Manager of changes to the Industrial User’s discharge 30 days prior to the change. The Manager shall approve, conditionally approve, or deny the change prior to the User making the change at the facility that may impact the discharge at the facility to the POTW.
   B.   Individual wastewater discharge permits may contain, but need not be limited to, the following conditions:
      1.   Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;
      2.   Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW;
      3.   Requirements for the development and implementation of spill control plans, or other special conditions, including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges;
      4.   Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW;
      5.   The schedule of User charges and fees, for the management of the wastewater discharged to the POTW;
      6.   Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices;
      7.   A statement that compliance with the individual wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State Pretreatment Standards, and local standards, including those which become effective during the term of the individual wastewater discharge permit: and
      8.   Other conditions as deemed appropriate by the Manager to ensure compliance with this chapter, and State and Federal laws, rules, and regulations. (Ord. 2018-27, 11-14-2018)