§ 155.066 CONSTRUCTION PROCEDURE AND MATERIALS.
   The subdivider shall design and construct improvements not less than the standards outlined in these regulations. The work shall be done under city supervision and inspection and shall be completed within the time fixed or agreed upon by the city. The minimum requirements for materials shall be in accordance with the standards of the current volume of “Construction and Material Specifications” of the Ohio Department of Transportation, the requirements of the Ohio Department of Health, and the Ohio Environmental Protection Agency. All inspection costs shall be paid by the subdivider.
(Ord. 20-89, passed 6-28-89)