The excavation, backfilling, patching and restoration and all other work performed in the right-of-way shall be done in conformance with engineering standards adopted by the PUC or other applicable local requirements, in so far as they are not inconsistent with the PUC Rules.
(Ord. 732, passed 4-5-99)