§ 154.096 TABLE OF ALLOWED TEMPORARY USES AND STRUCTURES.
   Table 12-1 summarizes allowed temporary uses and structures and any general or specific standards that apply. Temporary uses or structures not listed in the table are prohibited.
Table 12-1: Temporary Uses and Structures
Temporary Use or Structure
Allowable Duration (per site)
Permit Required
Additional Requirements
Temporary Use or Structure
Allowable Duration (per site)
Permit Required
Additional Requirements
Construction dumpster
Until issuance of a certificate of occupancy
No, unless within ROW
Construction trailer
Until issuance of a certificate of occupancy
No, unless within ROW
Farmer’s market
180 days per calendar year
Zoning certificate
Garage or yard sales
Maximum of three consecutive days, three times per calendar year
No
Gravel surface parking lots
Until issuance of a certificate of occupancy
No
Real estate sales / model homes
Until 85% occupancy of the phase is reached
Zoning certificate
Seasonal agricultural or horticultural sales
180 days per calendar year
Zoning certificate
Seasonal retail sales
45 days prior to the related holiday
Zoning certificate
Temporary storage in a portable container
60 days per site
No
Temporary structures
None specified
Zoning certificate
 
(Ord. 1040, passed 1-5-16)