Table 12-1 summarizes allowed temporary uses and structures and any general or specific standards that apply. Temporary uses or structures not listed in the table are prohibited.
Table 12-1: Temporary Uses and Structures
Temporary Use or Structure | Allowable Duration (per site) | Permit Required | Additional Requirements |
Temporary Use or Structure | Allowable Duration (per site) | Permit Required | Additional Requirements |
Construction dumpster | Until issuance of a certificate of occupancy | No, unless within ROW | |
Construction trailer | Until issuance of a certificate of occupancy | No, unless within ROW | |
Farmer’s market | 180 days per calendar year | Zoning certificate | |
Garage or yard sales | Maximum of three consecutive days, three times per calendar year | No | |
Gravel surface parking lots | Until issuance of a certificate of occupancy | No | |
Real estate sales / model homes | Until 85% occupancy of the phase is reached | Zoning certificate | |
Seasonal agricultural or horticultural sales | 180 days per calendar year | Zoning certificate | |
Seasonal retail sales | 45 days prior to the related holiday | Zoning certificate | |
Temporary storage in a portable container | 60 days per site | No | |
Temporary structures | None specified | Zoning certificate | |
(Ord. 1040, passed 1-5-16)