§ 157.069  SUBSTITUTIONS, ELECTRIC.
   (A)   Setbacks. All buildings and ground mounted equipment shall be set back minimum of 50 feet from all exterior property lines (except where the district specifies a greater minimum setback distance).
   (B)   Height. Structure height shall not exceed the maximum height requirements for the zoning district where the construction is located except for associated transmission infrastructure and lightning masts.
   (C)   Buffer. Vegetative buffer of 20 feet (within the minimum setback distances for that zoning district) shall be provided unless natural vegetation exists that will meet this same requirement.
   (D)    Security fencing required.
   (E)   Service parking area shall be provided on the same lot (parcel, property) and be at least twice as large as the structure footprint for the buildings and ground mounted equipment on-site.
(Ord. passed 5-7-2018; Ord. passed 6-7-2021)