(A) Manufactured homes used as a residence, containing bathroom, kitchen facilities, and established the principle building on a lot for a period not exceeding one year, as a temporary residence for the owner/caretaker of the lot (for temporary use only while the new construction or permanent residence is being built, permit renewal as necessary).
(B) This type of dwelling, as a temporary use, is permitted only when there is a principle (primary structure) building to be built on a single lot.
(C) The timeframe is for a period not exceeding one year, as a temporary residence for the owner/caretaker of the lot (temporary use only while new construction/permanent residence is built-with permit renewal as necessary).
(Ord. passed 5-7-2018; Ord. passed 6-7-2021)