§ 153.46  LOT CONDITION.
    The demolition contractors are required to level, compact, or fill any portion of the property that is affected by the deconstruction and removal of debris. The contractor shall take all measures possible to minimize any unnecessary disturbance of soil or vegetation on the property. The contractor is required to remove and replace any contaminated soil that results from the spillage of any fluids or hazardous materials from equipment associated with performing the demolition or removal of debris.
(Ord. passed 9-14-2009; Ord. passed 6-7-2021)