All demolition debris shall be removed from the site, by the demolition contractor, on a vehicle capable of safely transporting materials from the demolition site to a certified landfill or recycling center. During transportation, all debris must remain covered with a tarp or fabric and shall be properly secured, so as not to allow any debris to fall from the vehicle. All debris from any of the deconstructed components must be removed from the property.
(Ord. passed 9-14-2009; Ord. passed 6-7-2021)