No well shall be located, constructed, operated, or repaired in any manner that may adversely impact the quality of ground water. Any test holes and borings shall be permanently abandoned by the driller in accordance with § 52.58 of these rules within two days after drilling or two days after testing is complete, whichever is least restrictive; except in the case that a test well is being converted to a production well, in which case conversion shall be completed within 30 days.
(Ord. passed 7-23-1984)