1292.13 DUMPSTERS AND TRASH HANDLING AREAS.
   The following requirements shall apply to all uses that utilize dumpsters, trash handling areas, and related service entrances:
   (a)   Setbacks. Dumpsters, trash handling areas and related screening, shall be in compliance with the setback requirements for accessory structures as determined by the zone district in which such structure is constructed. The dumpster(s) shall be located on a concrete pad constructed of sufficient strength for the dumpsters and vehicles that will empty the dumpsters. A curb of a minimum of six inches in height shall be located between the dumpsters and fence to prevent damage to the fence.
   (b)   Location of Screen. Any such dumpster or trash handling area shall be screened on three sides by a fence or wall from the view from public streets and any abutting properties located in a residential, office, or commercial district. If the access to the dumpsters is visible from the public right-of-way, a gate shall be installed that fully screens the dumpsters.
   (c)   Height and Construction of Screen.
      (1)   Any fence or wall required under this section shall have a height no greater than seven feet and no less than five feet.
      (2)   If a wall is constructed, it shall be constructed in a durable fashion of brick, stone, or other masonry materials with no greater than 25% of the wall surface left open so as to prevent viewing of the dumpster units. Masonry materials should be painted in a similar color to the main building.
      (3)   Any fence shall be constructed in a durable fashion of wood. No more than 25% of the fence surface shall be left open between posts and/or planks so as to prevent viewing of the dumpster units.
      (4)   Fence, wall and gate materials shall be of a similar material or painted similarly to the main building.
 
(Ord. 2010-29. Passed 7-5-10.)