§ 15-411 CONNECTIONS; HOW MADE.
   Each connection shall be made at the “Y” designated for that property. The only exception shall be where the designated “Y” is not located within three feet of the point of measurement furnished by the city. Any connection not made at the designated “Y” in the main sewer shall be made under the direct supervision of the Superintendent of Distribution.