§ 15-219 SAME; COST CHARGED TO DEVELOPER.
   The developer of any property contained within a new electrical system area shall pay to the city the cost of all materials necessary to complete the new electrical system. The cost of materials charged to the developer shall include the cost of materials used to connect the new electrical system to an existing portion of the electrical system of the city even though the connection may be outside the new electrical system area. The cost of construction of feeder lines from the power plant or other similar points shall not be charged to the developer.
(Ord. 1225, passed 5-2-1995)