§ 15-204 SAME; INSTALLATION AND MAINTENANCE.
   Where the primary electrical wires of the city are adjacent to the premises desiring service, the city will make the necessary connection at the electric supply line, extend the drop line or wire to the meter box and supply the meter and meter box. The building wiring, breaker box and service entrance shall be provided and installed at the expense of the owner. All service entrances and metering equipment will be installed at or on the premises requiring electrical service. The city shall be responsible for the care and maintenance of the wiring and apparatus from the service entrance to the city’s primary power lines and the meter and all wiring and equipment installed by the city shall remain the property of the city. The city reserves the right at its option to remove and replace any such installation and the materials and equipment thereto attached. All extensions of the city’s primary electrical system in order to serve a particular customer shall be under the conditions set forth in § 15-218 of this chapter.
(Ord. 1209, passed 8-16-1994)