§ 13-111 SAME; TEMPORARY BACKFILL BY CONTRACTOR.
   The remaining eight inches between the excavation level and the surface level shall be filled with AB-3 (crushed rock), leaving no more than one-inch rise above the existing surrounding street grade after compaction.