The fee for an electric permit to install electric conductors and equipment as regulated by the National Electrical Code, adopted under § 4-402 of this article, shall be $35. Such fee is payable at the time the application is submitted for the electric permit, and the same shall be credited to the General Operating Fund of the city.
(Ord. 1629, passed 5-4-2014; Ord. 1772, passed 6-21-2022)