(a) Where the temperature in the surrounding area is below 70 degrees Fahrenheit, the maximum allowable time from loading to pour shall be one and one-half hours.
(b) Where the temperature in the surrounding area is 70 degrees Fahrenheit or above, the maximum allowable time from loading to pour shall be one hour.
(c) Where the temperature in the surrounding area falls below 35 degrees Fahrenheit within 24 hours after pour, the contractor shall protect the concrete for proper curing for at least five days following the pour, per recommendations of an Ohio licensed professional.
(Ord. 2008-12. Passed 3-4-08.)