The Storm Water Pollution Prevention Plan and Abbreviated Storm Water Pollution Plan review, filing, and inspection fee is part of a complete submittal and is required to be submitted to the Village upon application. The fee for Abbreviated Stormwater Pollution Prevent Plans is three hundred dollars ($300.00). Consult with Village Engineer for the fees for review, filing and inspection for Storm Water Pollution Prevention Plans.
(Ord. 2009-17. Passed 9-15-2009; Ord. 2013-25. Passed 12-17-13.)