1109.09 WATER SUPPLY REQUIREMENTS.
   (a)   The responsible officials are the Village Administrator, the Village Council, the Commission, and the Ohio Environmental Protection Agency.
   (b)   In general, all material and construction shall be in accordance with the current American Water Works Association standards and Specifications, and/or the current Ohio Department of Transportation Standards and Specifications, and/or the current Ohio Environment Protection Agency Standards and Specifications, and the Village of Wakeman.
   (c)   A minimum of ten (10) feet horizontally and eighteen (18) inches vertically from any sanitary sewer must be maintained. No entry or contact with a sewer manhole is permitted.
   (d)   All work must comply with Federal, State, and Local regulations in all respects, including compliance with the Occupational Health and Safety Act.
   (e)   The Contractor must at all times conduct his operations within the public right-of-way, easements, or work agreement as shown in the plans.
      (1)   The location of the underground utilities shown on the plans are as obtained from the owners of the utilities.
      (2)   At least two working days prior to commencing construction operations in an area which may involve underground utility facilities, the Contractor shall notify the Project Engineer, the registered utility protection service (1- 800-362-2764), and the owners of each underground utility facility shown in the plans.
   The owner of the underground utility facility shall, within forty-eight hours, excluding Saturday, Sundays, and legal holidays after notice is received, stake, mark or otherwise designate the location of the underground utility facilities in the construction area in such a manner as to indicate their course together with the approximate depth at which they were installed. The marking of location shall be coordinated to stay approximately two days ahead of the planning construction.
(Ord. 2000-0-02. Passed 1-24-00.)