(A) No person may operate a land-clearing and/or inert debris landfill without first obtaining a permit from the Division. A permit fee shall be adopted, from time to time, by the Board which shall be effective until amended or replaced.
(B) Applications to locate and/or operate land-clearing debris landfills shall contain the following information and shall be submitted to the Division:
(1) Zoning approval from the local governing body;
(2) A preliminary site plan (four copies) contains:
(a) Map or aerial photo providing the following information within one-fourth mile of the site:
1. Entire property owned by applicant on which disposal site will be located;
2. Location of all homes, buildings, public or private utilities, roads, wells, watercourses and general topography; and
3. Whether all or a portion of site is in flood hazard area (FEMA or Flood Hazard Soils) and location of the flood hazard area.
(b) Location of site on county road map;
(c) All information required in division (B)(1) of this section; and
(d) Any other pertinent information, requested by the Division.
(3) Upon approval of the preliminary site plan, a final site and operation plan (six copies) showing:
(a) A plot plan of the proposed site showing the property boundary, proposed landfilling limits, access controls, roads and streams;
(b) Erosion and sedimentation control plan which conforms to the standards set forth in the County Erosion and Sedimentation Control Ordinance;
(c) A description of the site that would be sufficient as a description in an instrument of conveyance (copy of deed);
(d) Type of material to be disposed of at the site;
(e) Name, address and phone number for party responsible for operation and maintenance of the site;
(f) Projected use after completion of the fill;
(g) All information required in the Unified Development Ordinance; and
(h) Any other pertinent information, including limits of the 100-year flood plain where applicable.
(C) Prior to receiving land-clearing and inert debris on any new site, the licensee shall:
(1) Record the permit as required by G.S. § 130A-301.1;
(2) Complete site preparation according to the approved operational plan; and
(3) Submit to an inspection by a representative of the Division.
(Ord. O-93-14, passed 9-7-1993) Penalty, see § 50.99