(A) Minimum lot size: 12,500 square feet for development existing as of January 1, 2006; 20,000 square feet for new development after January 1, 2006.
(B) Minimum lot frontage: 100 feet.
(C) Setback requirements:
(1) Minimum front yard setback: 100 feet.
(2) Minimum rear yard setback:
(a) 100 feet from any property line which abuts a residentially zoned or used property; right-of-ways shall not be included.
(b) 50 feet from any other property.
(3) Minimum side yard setback:
(a) 50 feet from any residentially zoned property;
(b) 15 feet from any other property.
(D) Minimum buffer width and location: 50 feet within the setback from any property line which abuts a residentially zoned or used property; right-of-ways shall not be included.
(E) Maximum height limitation: two and one half stories but not to exceed 35 feet.
(F) Maximum impervious coverage: 60%
(G) Maximum clearing limit: No more than 70% of the lot area shall be cleared of vegetation for the purpose of construction; provided, however, if the existing cleared area exceeds 70% of the lot area or the existing vegetation is immature or seasonal in nature and may be re-established in a relatively short period of time, compliance with this section may be adjusted to promote the purpose of this chapter.
(H) Minimum distance between buildings: eight feet.
(I) Minimum parking setbacks:
(1) 50 feet from any property line which abuts a residentially zoned or used property; right-of- ways shall not be included.
(2) 15 feet from any other property.
(Ord. 945-99, passed 9-13-99; Am. Ord. 85-06, passed 4-24-06)