§ 152.075 AREA AND BULK STANDARDS.
   (A)   Minimum lot size: 12,500 square feet for development existing as of January 1, 2006; 20,000 square feet for new development after January 1, 2006.
   (B)   Minimum lot frontage: 100 feet.
   (C)   Setback requirements:
      (1)   Minimum front yard setback:
         (a)   100 feet from any state right-of-way.
         (b)   50 feet from any county right-of-way.
         (c)   30 feet from any other right-of-way.
      (2)   Minimum rear yard setback:
         (a)   50 feet from any residentially zoned property.
         (b)   20 feet from any other property.
      (3)   Minimum side yard setback:
         (a)   50 feet from any residentially zoned property.
         (b)   20 feet from any other property.
   (D)   Minimum buffer width and location: 25 feet within the setback from any residentially zoned property.
   (E)   Maximum height limitation: 35 feet.
   (F)   Maximum impervious coverage: 60%.
   (G)   Maximum clearing limit: No more than 70% of the lot area shall be cleared of vegetation for the purpose of construction; provided, however, if the existing cleared area exceeds 70% of the lot area or the existing vegetation is immature and may be re-established in a relatively short period of time, compliance with this section may be waived by the reviewing board to promote the purpose of this chapter.
   (H)   Minimum parking setbacks:
      (1)   25 feet from any state right-of-way.
      (2)   20 feet from any other right-of-way.
      (3)   25 feet from any residentially zoned property.
      (4)   20 feet from any other rear property line.
      (5)   12 ½ feet from any other side property line except that zero feet is required where cross easements for parking are provided and maintained.
   (I)   A minimum of 25% of entire tract on which the development being proposed will be completed shall be set aside as contiguous open space. Of the 25%, no more than 50% shall be wetlands as designated by the New Jersey Department of Environmental Protection.
(Ord. 945-99, passed 9-13-99; Am. Ord. 07-2000, passed 3-13-00; Am. Ord. 85-06, passed 4-24-06)