(A) Minimum lot size: 12,500 square feet.
(B) Minimum lot frontage: 100 feet.
(C) Setbacks:
(1) Minimum front yard setback:
(a) 100 feet from any state right-of-way.
(b) 50 feet from any county right-of-way.
(c) 30 feet from any other right-of-way.
(2) Minimum rear yard setback:
(a) 75 feet from any residentially zoned property.
(b) 30 feet from any other property.
(3) Minimum side yard setback:
(a) 75 feet from any residentially zoned property.
(b) 10 feet from any other property.
(D) Minimum buffer width and location: 25 feet within the setback from any residentially zoned property.
(E) Maximum height limitation: two and one half stories, not to exceed 35 feet.
(F) Maximum impervious coverage: 60%.
(G) Maximum clearing limit: No more than 70% of the lot area shall be cleared of vegetation for the purpose of construction; provided, however, if the existing cleared area exceeds 70% of the lot area or the existing vegetation is immature and may be re-established in a relatively short period of time, compliance with this section may be waived by the reviewing board to promote the purpose of this chapter.
(H) Minimum parking setbacks:
(1) Front yard setbacks:
(a) 50 feet from any state right-of-way.
(b) 20 feet from any other right-of-way.
(2) 25 feet from any residentially zoned property.
(3) 15 feet from any other rear property line.
(4) 10 feet from any other side property line except that zero feet may be permitted where cross easements for parking are provided and maintained.
(I) A minimum of 25% of entire tract on which the development being proposed will be completed shall be set aside as contiguous open space. Of the 25%, no more than 50% shall be wetlands as designated by the New Jersey Department of Environmental Protection.
(Ord. 945-99, passed 9-13-99)