925.12.2 PERMIT CONDITIONS.
   Industrial Discharge Permits shall be expressly subject to all the provisions of this article, all other applicable Pretreatment regulations and/or requirements, and any User charges and fees as shall be established by the City. Permits may contain the following:
   (a)    The unit charge or schedule of User charges and fees for the wastewater to be discharged to a community sewer;
   (b)    Limits on the average and maximum wastewater constituents and characteristics;
   (c)    Limits on average and maximum rates and time of discharge or requirements for flow regulations and equalization;
   (d)    Requirements for installation and maintenance of inspection and sampling facilities;
   (e)    Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standard for tests and reporting schedule;
   (f)    Compliance schedules;
   (g)    Requirements for submission of technical reports or discharge reports (see Section 925.12.5).
   (h)    Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the Department of Public Works, and affording the Department of Public Works access thereto;
   (i)    Requirements for notification of the Department of Public Works of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system.
   (j)   Requirements for notification of slug discharges.
   (k)    Other conditions as deemed appropriate by the Department of Public Works to ensure compliance with this article.
      (Ord. O-3-08. Passed 7-24-08.)