§ 150.32 SPECIAL PERMITS; APPLICANT TO PAY COST OF ALTERING UTILITY WIRES.
   Every applicant for a permit to move any building or structure over the public rights-of-way of the city shall be required to pay an advance minimum sum of an amount, set by resolution, for each electric wire or cable of any municipal utility which must be cut, altered, or removed; and the necessity for the removal or alteration of the wires or cable shall be determined by the city’s Superintendent of Electrical Distribution. The minimum charge shall be paid by the applicant to the Finance Officer at least 3 days prior to the day on which any structure is moved over a public right-of-way.
(1975 Code, § 7-29) (Ord. 367, passed 2-2-1959; Am. Ord. 1271, passed 1-3-2012)