Before any structure is moved onto a tract of ground pursuant to this chapter, a diagram showing water and sewer connections must be presented to the Building Official for approval. If the structure is beyond the minimum distance required for connecting with the city sewer system, then the diagram must show plans for septic tank system compliance, which is mandatory if connection with the city sewer is not required.
(1975 Code, § 7-27) (Ord. 367, passed 2-2-1959; Am. Ord. 1271, passed 1-3-2012)