   The removal, razing or demolition of the building or structure shall be completed within 120 days of the issuance of the permit. An extension of this time limit may be issued at the discretion of the Director of Public Service. Upon failure to complete the removal, razing or demolition within this 120-day limit, or any extension thereof, a penalty as provided in Section 1472.99 shall be imposed. Cleaning up of the premises shall be done within the prescribed time limit or any extension of the limit.
(Ord. 801. Passed 3-4-63.)