(A) All industrial dischargers proposing to connect to or to discharge sewage, industrial wastes and other wastes to the POTW shall comply with all terms of this chapter within 90 days after the effective date of this chapter.
(B) All industrial dischargers proposing to contribute cyanide to the POTW shall obtain a wastewater discharge permit before contributing cyanide to the POTW. All existing industrial dischargers contributing cyanide to the POTW shall obtain a wastewater discharge permit within a period established by the POTW, but not to exceed 180 days after the effective date of this chapter.
(1981 Code, § 52.31) (Ord. 6586-93, passed 1-10-1994) Penalty, see § 52.99