(a) Building Permits | Fees |
(1) One, two and three-family, or any part covered by the Residential Code of Ohio for One, Two and Three Family Dwellings | $0.36/SF Min. $50.00 |
(2) Multi-family and commercial, covered by the Ohio Building Code | $0.41/SF |
(3) Foundation permits (commercial only) | $306.00 |
(b) Application and Review Fees | Fees |
(1) Multi-family and commercial application fee for permits covered by the Ohio Building Code for all permits | $66.00 |
(2) All residential application fees | $26.00 |
(3) Commercial plan review - cost of contract+ | $26.00/HR |
(4) Site/storm water plan review - cost of contract+ | $26.00/HR |
(5) One, two and three-family residential plan review | $51.00 |
(c) Zoning and Occupancy Certificates | Fees |
(1) Multi-family and commercial zoning | $255.00 |
(2) One, two and three-family residential zoning | $102.00 |
(3) Accessory structure zoning | $82.00 |
(4) Board of Zoning Appeals application - commercial | $306.00 |
(5) Board of Zoning Appeals application - residential | $153.00 |
(6) Conditional use permit | $306.00 |
(7) Rezoning application | $510.00 |
(8) Planned unit development application | $510.00 |
(9) Planned unit development amendment | $255.00 |
(10) Commercial occupancy - each occupancy | $77.00 |
(11) Multi-family occupancy - per unit | $66.00 |
(12) Residential occupancy - per unit | $46.00 |
(13) Commercial temporary occupancy | $255.00 |
(14) Residential temporary occupancy | $168.00 |
(d) Heating/Gas Permits | Fees |
(1) Unit heater | $46.00 |
(2) Furnace/air conditioner/heat pump | $46.00 |
(3) Hydronic piping | $224.00 |
(4) Refrigeration piping | $224.00 |
(5) Duct work | $46.00 |
(6) Fire damper 1-10 | $46.00 |
Each additional | $10.00 |
(7) Fan/blower | $46.00 |
(8) Fireplace | $46.00 |
(9) Gas piping (per meter set) | $66.00 |
(10) Smoke shutdown | $46.00 |
(11) Hood & duct system | $112.00 |
(e) Fire Protection/Tank Permits | Fees |
(1) Sprinkler (full) | $357.00 |
Modified | $179.00 |
Limited/armover | $92.00 |
(2) Fire line - no tap required | $510.00 |
(3) Standpipe | $56.00 |
(4) Firepump | $179.00 |
(5) Alternative suppression system | $133.00 |
(6) Flow test | $102.00 |
(7) Alarm system – full | $357.00 |
Modified/limited | $179.00 |
Egress control | $92.00 |
(f) Non Pressure Vessel Permits | Fees |
(1) Above ground installation 1-3 | $61.00 |
Each additional | $31.00 |
(2) Underground installation 1-3 | $66.00 |
Each additional | $31.00 |
(3) Above ground removal | $56.00 |
(4) Underground removal per site | $56.00 |
(g) Pressure Vessel Permits | Fees |
(1) Above ground installation 1-3 | $61.00 |
Each additional | $31.00 |
(2) Underground installation 1-3 | $66.00 |
Each additional | $31.00 |
(3) Removal | $56.00 |
(h) Electric Permits | Fees |
(1) New service (first 200 Amp) | $46.00 |
Each additional (100 Amp) | $26.00 |
(2) Temporary pole | $46.00 |
(3) Rough inspection | $46.00 |
(4) Transformer | $46.00 |
(5) Final inspection | $56.00 |
(6) Per circuit | $4.00 |
(7) Alterations of existing wiring | $46.00 |
(8) Electric for sign | $56.00 |
(9) Above ground pool | $46.00 |
(10) In ground pool | $112.00 |
(11) Service reconnect | $92.00 |
(12) Re-inspection or misc. inspection | $92.00 |
(13) Residential service change | $46.00 |
(i) Miscellaneous Permits | Fees |
(1) Permanent sign | $3.00/SF with a $51.00 minimum |
(2) Temporary sign | $46.00 |
(3) Swimming pool/hot tub | $77.00 |
(4) Tent | $77.00 |
(5) Fence | $46.00 |
(6) TV towers/satellite dishes | $46.00 |
(7) Building demolition | $15.00/1KSF - $153.00 minimum |
(8) Curb & sidewalk | $56.00 |
(9) Water/sewer lateral repair/replace - insp. only | $56.00 |
(10) House drainage | $56.00 |
(11) Portable storage unit | $46.00 |
(12) V-Rad | $128.00 |
(13) Move building | $510.00 + plan review |
(14) Re-inspection per hour | $66.00 |
(15) Special scheduled inspections afterhours | $112.00/HR – 2 hour minimum |
(16) Penalty for work without obtaining permit | Double total permit fee |
(17) Right-of-way/privilege permit – for property owner performing work on or in R/W adjacent to their own property | $51.00 |
(18) Right-of-way/privilege permit – for contractors or utility companies | $204.00 |
(j) Subdivision/Platting Fees | Fees |
(1) Preliminary plat | $306.00 |
(2) Final plat - 2% of public imp costs - for inspections | $306.00 minimum |
(3) Final plat - administrative approval only | $102.00 |
(4) Re-plat - PC & Council approval | $306.00 |
(5) Re-plat - administrative approval only | $77.00 |
(6) Lot split (no plat required) | $77.00 |
(k) Infrastructure Fee | Fees |
(1) New build or expansion for multi- family and commercial, covered by the Ohio Building Code | $1.02/SF
|
(Ord. 92-09. Passed 5-18-92; Ord. 02-07. Passed 3-18-02; Ord. 04-02. Passed 1-19-04; Ord. 06-24. Passed 10-16-06; Ord. 08-30. Passed 11-17-08; Ord. 15-16. Passed 8-17-15; Ord. 22-11. Passed 4-4-22; Ord. 23-14. Passed 6-19-23.)