1040.03   NOTICE TO TAP; COSTS; CONNECTIONS AND MATERIALS.
   No tap to the sewer and/or water service shall be made without at least twenty-four hours notice to the City prior to the date on which the tap is to be made. The permit and entrance fee for water permits shall cover the cost of the entrance installation by persons authorized by the City. A corporation cock shall be furnished by the Department of Public Service for all services from three-fourths of an inch to two-inches in diameter. The City shall, in addition, provide water meters for all services, such water meters to remain the property of the City. However, for all services in excess of one inch in diameter, the applicant shall, in addition to the permit and entrance fee established in Section 1040.02, pay to the City the cost of such larger water meter, subject to a credit for the cost of a one-inch meter. The permit and entrance fee for sewer service shall cover the cost of all inspections by authorized personnel of the City. Saddle and sealing material, in addition to all other material required, shall be furnished by the contractor. Connections shall be cast-iron soil pipe, vitrified bell-type sewer tile or polyvinyl chloride (PVC) pipe (minimum SDR-35) with waterproof sealed joints, installed and maintained at proper grade, all at the expense of the property owner. If any other type of pipe or tile is proposed, it shall be fully described in the application for the permit, and its usage shall be subject to prior approval by the City.
(Ord. 92-14. Passed 7-6-92.)