(A) Generally. Easements shall be provided as follows.
(B) Easements provided.
(1) Utility easements. Easements for underground utilities shall be centered on rear or side lot lines.
(2) Drainage easements. Where a subdivision is traversed by a stream or drainage way, an easement shall be provided conforming with the lines of the stream and shall be of sufficient width as will be adequate for the purpose.
(3) Floodplain easement. Where a portion of a subdivision is located in a floodplain, the floodplain shall be clearly designated on the plat in compliance with required “Flood Easement” statement listed in the Planning Department Policies and Procedures.
(Ord. passed 6-7-2004, § 410) Penalty, see § 10.99