(a) Plan Required. An applicant shall develop a Comprehensive Storm Water Management Plan describing how the quantity and quality of storm water will be managed after construction is complete for each discharge from the site and/or into a water resource or small municipal separate storm sewer system. The comprehensive plan developed to comply with this regulation will be coordinated and combined with the riparian plan and the post-construction water quality plan that are developed for the same site. These plans together will be part of the overall Storm Water Management Plan that will be submitted for the site. The comprehensive storm water management plan so developed will serve as the storm water pollution prevention plan (SWP3) required by Ohio EPA as part of the NPDES storm water permit for general construction.
(Ord. 2015-3-5. Passed 4-7-15; Ord. 2017-3-16. Passed 5-2-17.)