1040.02 INSPECTIONS.
   An application submitted for a sewer connection permit shall be deemed to be a perpetual license to the Village and its agents or employees to enter upon the premises wherein the connection is located for the purpose of inspecting, testing and maintaining the connection. The minimum requirements, rules, regulations, standards and details for sewers and connections shall be as established by the Ohio EPA, the Ohio Plumbing Code and the Village Engineer and which are now on file. The Inspector of Buildings and/or the Village Engineer shall ensure compliance with this chapter. All sewer installations shall be inspected by the Village upon notification by the contractor to the Inspector at least twenty-four hours before the work will be ready for inspection. Any work covered prior to inspection shall be uncovered by the contractor, and the Inspector shall be given the opportunity to inspect the interior as well as the exterior of the pipe. The actual tapping or connecting of a sewer connection into a public sewer shall be made only in the presence of the Inspector. The owner and/or contractor shall cooperate with the Inspector in testing the installation of all sewer connections to check for infiltration and proper separation of storm and sanitary discharge. The applicant shall be responsible for payment of all costs involved for the necessary time expended by the Village Engineer in the plan review, supervision and inspection of all sewer connections.
(Ord. 84-5-2. Passed 5-1-84; Ord. 2017-3-13. Passed 3-7-17.)