Upon receipt of the written application and permit fee referred to in Section 1028.01, the Village Engineer shall proceed to inspect the portion of the ditch sought to be piped or filled. In the case of piping, he shall determine the size and quality grade of the pipe to be used, the location and the grade of the pipe and the location of any yard drains or basins that would be required to provide adequate surface drainage. In the case of the filling of any existing roadside drainage ditch or swail, the Village Engineer shall make such determinations as he deems necessary in order to insure proper pavement drainage. After making all necessary determinations, the Village Engineer shall, if the application is otherwise in accordance with law, issue a permit to the applicant, good for a period of four months thereafter, authorizing the applicant to pipe or fill the drainage ditch or swale in accordance with his determinations, these determinations having been made a part of the permit issued.
(Ord. 77-6-8. Passed 6-21-77.)